Advertisement
SMRT Train Operating Hours / Fare Calculator
SMRT train schedule Singapore: In this growing world, Speed is more important for all human being. Nothing is easier without good Speed. SMRT train is just like that.It was developed by SMRT Trains Limited which is a rail operator in Singapore in 1987. Tan Ek Kia is the CEO and Koh Yong Guan is the Chairman of this company. It is generally used for people for traveling.
On 7 November 1987, MRTC (Mass Rapid Transit Corporation) started services in Singapore, consisting of five stations from Yio Chu Kang to Toa Payoh. SMRT Trains currently manages MRT services on North East Line and Downtown Line.
On 10 May 2004, the company adopted the SMRT logos. Those logos are C151, C151A, C151B, C651, C751B, C830 and C830C.
The C151, C651, C751B and the C151A run between North South Line and the East West Line. Only C830 runs on the Circle Line. These all are electric multiple units and those speeds are between 85 km/h to 90 km/h.
SMRT Corporation operates three main rail lines, the North South Line which runs from Marina Bay Station to Jurong East Station, and the East West Line which runs from Pasir Ris Station to Joo Koon Station, and the Circle Line, which runs from Dhoby Ghaut Station to Harbour Front Station.
You can visit the official website for SMRT Train Timing Singapore, Route Map, Operating Hours and Fare Calculator.
This feature makes human life comfortable.
Most Searching Terms:
- SMRT train schedule Singapore